	<title>Duration-Driven &#124; A Project Management Blog &#187; Project Management</title>
	<atom:link href="http://www.duration-driven.com/category/project-management/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.duration-driven.com</link>
	<description>Our Methodology Your Success</description>
	<lastBuildDate>Thu, 02 Feb 2012 22:37:07 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>6 Things to Know About Specifications</title>
		<link>http://www.duration-driven.com/2012/02/6-things-to-know-about-specifications/</link>
		<comments>http://www.duration-driven.com/2012/02/6-things-to-know-about-specifications/#comments</comments>
		<pubDate>Thu, 02 Feb 2012 22:37:07 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Management Tips]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=978</guid>
		<description><![CDATA[Specifications are everywhere—the storage capacity of external hard drives to the operating temperature of lighting fixtures—and they’re often useful guidelines. But to be sure you get the end result you need, there are some things every project professional should remember about specs. 1 – Be careful about taking the manufacturer’s specifications as the final word. [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2012/02/6-things-to-know-about-specifications/"></g:plusone></div><p>Specifications are everywhere—the storage capacity of external hard drives to the operating temperature of lighting fixtures—and they’re often useful guidelines. But to be sure you get the end result you need, there are some things every project professional should remember about specs.</p>
<p><span id="more-978"></span></p>
<p>1 – Be careful about taking the manufacturer’s specifications as the final word. How equipment and systems are used, installed, monitored, and linked to other systems could affect their behavior during actual use. Discuss your environment’s details with the manufacturer to get the most realistic picture of what everyday usage will be like.</p>
<p>&nbsp;</p>
<p>2 – If you’re modifying anything in an off-the-shelf piece of equipment or software, the original specifications shouldn’t be used as-is. Instead, determine how user expectations should be revised to match the changes you’ve made.</p>
<p>&nbsp;</p>
<p>3 – The specifications of raw materials don’t always translate cleanly to the specs of a completed product. Be sure your team takes the time to do sufficient product testing before using early-process specs to calculate the final numbers.</p>
<p>&nbsp;</p>
<p>4 – When rolling out information to end users, be sure to clearly delineate where your team’s specs end and manufacturer’s specs begin. This is especially important when it comes to troubleshooting—mistaking incorrect expectations for an actual problem could send you off on a wild goose chase.</p>
<p>&nbsp;</p>
<p>5 – Some systems and pieces of equipment are designed to stop functioning if the minimum specs aren’t being achieved—it’s often a fail-safe measure. If your daily usage might impact the item’s operation, be sure to discuss the issue with the manufacturer before making a purchasing decision.</p>
<p>&nbsp;</p>
<p>6 – If there are interdependencies in your final setup, confirm how any variation in one component’s specs might affect the rest of the system. Unexpected shutdowns could lead to lost productivity, and malfunctions might even cause wide-scale damage.</p>
<p><a href="http://www.duration-driven.com/wp-content/uploads/2012/02/6ThingsToKnowAboutSpecifications.png"><img class="alignnone size-full wp-image-979" title="6ThingsToKnowAboutSpecifications" src="http://www.duration-driven.com/wp-content/uploads/2012/02/6ThingsToKnowAboutSpecifications.png" alt="" width="300" height="286" /></a></p>
<p><em><a href="http://pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://pm-alliance.com/project-management-services/project-management-consulting/" target="_blank">project management consulting</a>, <a href="http://pm-alliance.com/project-management-services/project-management-training/" target="_blank">project management training</a> and <a href="http://pm-alliance.com/project-management-services/project-office-development/" target="_blank">project office development</a></em> services.</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2012/02/6-things-to-know-about-specifications/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Reinvent Your PMO</title>
		<link>http://www.duration-driven.com/2012/01/reinvent-your-pmo/</link>
		<comments>http://www.duration-driven.com/2012/01/reinvent-your-pmo/#comments</comments>
		<pubDate>Fri, 27 Jan 2012 16:36:10 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[PMO Development]]></category>
		<category><![CDATA[Project Management]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=969</guid>
		<description><![CDATA[Tough times may have led to a lot of staffing shakeups, plus put a damper on the size and scope of the projects teams are managing. If your PMO’s post-recession image needs some polishing, we’ve put together a roadmap to take you into a brighter future. Reintroduce your team. There’s a good chance at least [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2012/01/reinvent-your-pmo/"></g:plusone></div><p>Tough times may have led to a lot of staffing shakeups, plus put a damper on the size and scope of the projects teams are managing. If your PMO’s post-recession image needs some polishing, we’ve put together a roadmap to take you into a brighter future.</p>
<p><img title="More..." src="http://duratio.pm-alliance.com/wp-includes/js/tinymce/plugins/wordpress/img/trans.gif" alt="" /></p>
<p><strong>Reintroduce your team.</strong> There’s a good chance at least one of your stakeholder segments doesn’t know who’s who anymore. Take this opportunity to tout each team member’s strengths and skills, and consider scheduling an afternoon meet-and-greet if it fits your organization’s culture. Building stakeholder support is often easier when they know your team as more than just photos on an intranet page.</p>
<p>&nbsp;</p>
<p><strong>Advertise recent successes.</strong> Projects might have been cut or postponed in the last few years, but you still have a lot of positive news to share. Pull out a few success stories and toot your own horn. Stakeholders are more willing to support new initiatives when they see your PMO was successful even during the darkest days. Team members will also be buoyed by recalling those challenging objectives they reached.</p>
<p>&nbsp;</p>
<p><strong>Outline the road ahead.</strong> Even if your PMO’s schedule isn’t as full as it used to be, it’s important for your team and its stakeholders to be looking forward. Be sure to send regular “what’s on the horizon” news blurbs, and send a quick update when new projects are added.</p>
<p>&nbsp;</p>
<p><strong>Clean up your lists.</strong> Make a break with what may have been a depressing past and update your distribution and communication lists. Delete anyone who’s no longer on the team and add new members. Update contact information for supporters, end users, and vendors as well. Remember to give some attention to your less formal communication channels, too—bulletin boards, department calendars and emergency contact lists should all be brought up to date.</p>
<p><a href="http://duratio.pm-alliance.com/wp-content/uploads/2012/01/ReinventYourPMO.png"><img title="ReinventYourPMO" src="http://duratio.pm-alliance.com/wp-content/uploads/2012/01/ReinventYourPMO.png" alt="" width="304" height="280" /></a></p>
<p><em><a href="http://pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://pm-alliance.com/project-management-services/project-management-consulting/" target="_blank">project management consulting</a>, <a href="http://pm-alliance.com/project-management-services/project-management-training/" target="_blank">project management training</a> and <a href="http://pm-alliance.com/project-management-services/project-office-development/" target="_blank">project office development</a></em> services.</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2012/01/reinvent-your-pmo/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>PMO Resolutions for the New Year</title>
		<link>http://www.duration-driven.com/2012/01/pmo-resolutions-for-the-new-year/</link>
		<comments>http://www.duration-driven.com/2012/01/pmo-resolutions-for-the-new-year/#comments</comments>
		<pubDate>Fri, 20 Jan 2012 15:11:39 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Checklists]]></category>
		<category><![CDATA[PMO Development]]></category>
		<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Office]]></category>

		<guid isPermaLink="false">http://duratio.pm-alliance.com/?p=958</guid>
		<description><![CDATA[While your mind is on your own individual goals for the new year, why not also take the opportunity to look at where your PMO is and where you want to take it in the coming months? If you’re stuck for ideas, we’ve put together some resolutions you can use as a launch pad. Improve [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2012/01/pmo-resolutions-for-the-new-year/"></g:plusone></div><p>While your mind is on your own individual goals for the new year, why not also take the opportunity to look at where your PMO is and where you want to take it in the coming months? If you’re stuck for ideas, we’ve put together some resolutions you can use as a launch pad.</p>
<p><img title="More..." src="http://www.duration-driven.com/wp-includes/js/tinymce/plugins/wordpress/img/trans.gif" alt="" /></p>
<p><strong>Improve communication.</strong> Even PMOs that are really good at communicating should make improvement a yearly goal. <a href="http://www.duration-driven.com/2011/02/be-a-better-communicator/" target="_blank">http://www.duration-driven.com/2011/02/be-a-better-communicator/</a> Talking with end users, providing stakeholders with progress reports, and maintaining good lines of communication within your team are all critical to project success.</p>
<p>&nbsp;</p>
<p><strong>Boost career development efforts.</strong> Now is not the time to let your project professionals grow stagnant—if you don’t give them a path toward greater opportunities, there’s a good chance your competitors will. Encourage team members to set goals that keep them motivated <a href="http://www.duration-driven.com/2010/10/setting-individual-goals-9-tips-for-success-2/" target="_blank">http://www.duration-driven.com/2010/10/setting-individual-goals-9-tips-for-success-2/</a> and facilitate mentoring relationships whenever possible <a href="http://www.duration-driven.com/2010/06/find-the-right-business-mentor/" target="_blank">http://www.duration-driven.com/2010/06/find-the-right-business-mentor/</a>.</p>
<p>&nbsp;</p>
<p><strong>Increase ongoing education.</strong> As project workloads ramp up, training is one of the first things moved to the back burner <a href="http://www.duration-driven.com/2011/10/training-mistakes-most-pmos-make/" target="_blank">http://www.duration-driven.com/2011/10/training-mistakes-most-pmos-make/</a>. Instead, resolve this year to keep your team’s education on the priority list. Schedule classes early and be sure everyone on the team has the opportunity to learn something new.</p>
<p>&nbsp;</p>
<p><strong>Develop a more robust network.</strong> Reach out to fellow professionals before you need help.<a href="http://www.duration-driven.com/2011/02/be-a-better-communicator/" target="_blank">http://www.duration-driven.com/2011/02/be-a-better-communicator/</a> Your team will have better access to resources—including consultants, market research specialists, equipment suppliers, and potential new employees—and will also be more in tune with regional and industry trends.</p>
<p>&nbsp;</p>
<p><strong>Market your PMO.</strong> In many organizations, it’s no longer enough to be good project managers. Your ability to engage stakeholders and end users <a href="http://www.duration-driven.com/2011/09/more-tips-for-good-project-management-pr/" target="_blank">http://www.duration-driven.com/2011/09/more-tips-for-good-project-management-pr/</a> is increasingly important, and could influence everything from budget approval to staffing levels.</p>
<p>&nbsp;</p>
<p><strong>Commit to creativity.</strong> Your team’s ability to develop innovative solutions can help manage any problem <a href="http://www.duration-driven.com/2010/12/project-management-creative-problem-solving/" target="_blank">http://www.duration-driven.com/2010/12/project-management-creative-problem-solving</a>/. Implement some creativity-building activities and watch your team triumph over challenges.</p>
<p><a href="http://www.duration-driven.com/wp-content/uploads/2012/01/PMO-Resolutions.jpg"><img title="Business people standing with hands together" src="http://www.duration-driven.com/wp-content/uploads/2012/01/PMO-Resolutions.jpg" alt="" width="352" height="341" /></a></p>
<p><em><a href="http://pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://pm-alliance.com/project-management-services/project-management-consulting/" target="_blank">project management consulting</a>, <a href="http://pm-alliance.com/project-management-services/project-management-training/" target="_blank">project management training</a> and <a href="http://pm-alliance.com/project-management-services/project-office-development/" target="_blank">project office development</a></em> services.</p>
<p>&nbsp;</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2012/01/pmo-resolutions-for-the-new-year/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>NFL Playoffs: Mirroring Your Strategic Project Initiatives</title>
		<link>http://www.duration-driven.com/2012/01/nfl-playoffs-mirroring-your-strategic-project-initiatives/</link>
		<comments>http://www.duration-driven.com/2012/01/nfl-playoffs-mirroring-your-strategic-project-initiatives/#comments</comments>
		<pubDate>Wed, 18 Jan 2012 01:04:56 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Management Tips]]></category>
		<category><![CDATA[Project Management Training]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=894</guid>
		<description><![CDATA[All football games are not created equal; some matter more than others. Consider regular season games compared to the playoffs. In the regular season, teams have a standard weekly preparation—they develop strategies for the immediate challenge ahead, and attempt to execute their plan each Sunday. Sometimes they win, sometimes they lose. And though each game [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2012/01/nfl-playoffs-mirroring-your-strategic-project-initiatives/"></g:plusone></div><p>All football games are not created equal; some matter more than others. Consider regular season games compared to the playoffs. In the regular season, teams have a standard weekly preparation—they develop strategies for the immediate challenge ahead, and attempt to execute their plan each Sunday. Sometimes they win, sometimes they lose. And though each game is slightly different, the preparation and execution are relatively similar. As the season marches on, some teams get very good at executing their plan while others flounder. These weekly engagements are similar in concept to a company’s routine “utility” projects—those keep-the-lights-on projects that teams do time and again. Through the repetition of planning and executing these projects, teams get comfortable in the routine, with little assistance needed to get ready for the next week.</p>
<p><span id="more-894"></span></p>
<p>Some project managers become so good at the weekly projects that they make it to the “post season”, which is an entirely different challenge. During the “regular season”, a potential project failure is not the end of the world—they’ll live to fight another week, and probably be offered similar projects again. But one wrong move during the playoffs and the season comes to an end. A company’s strategic projects are the business equivalent of the playoffs. These are the projects that carry a higher degree of financial consequence, a greater level of executive visibility, and hold more market importance. Simply put, these projects cannot afford to fail. As stated during a recent interview with Tom Brady, quarterback for the New England Patriots, “The difference between this week’s playoff game and a regular season game is that this playoff game has a lot more scrutiny, a higher degree of visibility, and we have a lot more at stake.” Sound familiar?</p>
<p>&nbsp;</p>
<p>A company’s strategic projects are like the NFL playoffs. There are no second chances if the project fails. By their nature, strategic projects come along only occasionally, just as even the best NFL teams only make it to the playoffs every few years. Because of this elevated level of importance, you need to arm your teams with advanced project management tools, utilize more rigor in your planning processes, boost your teamwork and communication, and execute the project with pinpoint accuracy. Preparing your team with these skill sets will guarantee a successful run through the project management playoffs!</p>
<p>&nbsp;</p>
<p><em><a title="PMAlliance | Project Management Consulting" href="http://www.pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://www.pm-alliance.com/Project_Management_Consulting.htm">project management consulting</a>, <a href="http://www.pm-alliance.com/Project_Management_Training.htm">project management training</a> and <a href="http://www.pm-alliance.com/Project_Office_Development.htm">project office development</a></em> services.</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2012/01/nfl-playoffs-mirroring-your-strategic-project-initiatives/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Look Back, Move Forward</title>
		<link>http://www.duration-driven.com/2012/01/look-back-move-forward/</link>
		<comments>http://www.duration-driven.com/2012/01/look-back-move-forward/#comments</comments>
		<pubDate>Mon, 16 Jan 2012 23:41:57 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Management Tips]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=890</guid>
		<description><![CDATA[Are you getting maximum mileage out of every project? If you don’t regularly evaluate past projects, you’re missing out on some prime learning opportunities. Once you’ve conducted an in-depth post mortem on a project http://www.duration-driven.com/2010/03/project-management-post-mortem-analysis/, step back a little further to see if you can spot meaningful patterns. Staffing levels. If reviewing recent projects highlights [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2012/01/look-back-move-forward/"></g:plusone></div><p>Are you getting maximum mileage out of every project? If you don’t regularly evaluate past projects, you’re missing out on some prime learning opportunities. Once you’ve conducted an in-depth post mortem on a project <a href="http://www.duration-driven.com/2010/03/project-management-post-mortem-analysis/">http://www.duration-driven.com/2010/03/project-management-post-mortem-analysis/</a>, step back a little further to see if you can spot meaningful patterns.</p>
<p><span id="more-890"></span></p>
<p><strong>Staffing levels.</strong> If reviewing recent projects highlights less-than-optimal results due to insufficient staffing, work with your team on potential solutions. Leveraging temporary or consultant support and modifying project timeframes or scope are common fixes, but innovative teams will likely find additional ways to address staffing concerns.</p>
<p>&nbsp;</p>
<p><strong>Division of responsibilities.</strong> Is it time to shake up the status quo? If you see that you’ve been doling out the same tasks to the same people, consider giving a few of your best performing junior-level team members some new challenges. At the same time, try offering your more experienced pros a change of pace to keep them sharp.</p>
<p>&nbsp;</p>
<p><strong>Vendor relationships.</strong> Even if your vendors are meeting your needs, now is the time to see if there are still issues you’re struggling to overcome. Do your vendors have the best connections to address potential supply chain issues? Are time zone differences causing more effort than should be necessary? Have they experienced staffing issues of their own? Look for ways to streamline your operations through the support of your vendors.</p>
<p>&nbsp;</p>
<p><strong>Cyclical challenges. </strong>By reviewing projects in batches, you may discover repeating cycles that set your team up for difficulty. If you’re consistently tackling the most complex projects during times when your resources are lowest—over the holidays when more folks are out of the office, or perhaps it’s in the first quarter when the year’s funds are still being approved and released—you might consider talking with stakeholders to develop a different kind of schedule for future projects.</p>
<p><a href="http://www.duration-driven.com/wp-content/uploads/2012/01/Look-Back-Move-Forward.jpg"><img class="alignnone size-full wp-image-891" title="Excellent Rating" src="http://www.duration-driven.com/wp-content/uploads/2012/01/Look-Back-Move-Forward.jpg" alt="" width="347" height="346" /></a></p>
<p><em><a title="PMAlliance | Project Management Consulting" href="http://www.pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://www.pm-alliance.com/Project_Management_Consulting.htm">project management consulting</a>, <a href="http://www.pm-alliance.com/Project_Management_Training.htm">project management training</a> and <a href="http://www.pm-alliance.com/Project_Office_Development.htm">project office development</a></em> services.</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2012/01/look-back-move-forward/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>4 Tips For Sharing Bad News</title>
		<link>http://www.duration-driven.com/2012/01/4-tips-for-sharing-bad-news/</link>
		<comments>http://www.duration-driven.com/2012/01/4-tips-for-sharing-bad-news/#comments</comments>
		<pubDate>Fri, 06 Jan 2012 11:57:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Management Tips]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=886</guid>
		<description><![CDATA[Dear stakeholder: We have a problem. If you dread communicating project glitches to customers, take heart—telling folks your project is facing issues is rarely a fun task, but we have some suggestions on how (and why) to get bad news out in the open. &#160; 1 – Say it early. Unless it’s an issue you’re [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2012/01/4-tips-for-sharing-bad-news/"></g:plusone></div><p><em>Dear stakeholder: We have a problem.</em> If you dread communicating project glitches to customers, take heart—telling folks your project is facing issues is rarely a fun task, but we have some suggestions on how (and why) to get bad news out in the open.</p>
<p><span id="more-886"></span></p>
<p>&nbsp;</p>
<p><strong>1 – Say it early.</strong> Unless it’s an issue you’re certain can be handled internally without <em>any</em> detectable effects on stakeholders, you’re best off sounding the alert early. End users and supporters are more likely to be amenable to solutions that impact timeframes or final objectives if they can see you’ve been proactive and upfront with them.</p>
<p>&nbsp;</p>
<p><strong>2 – Say it clearly</strong>. Now is not the time for buzzwords or vague project-speak—confusing your stakeholders will only make them more unhappy. Instead, plainly state the issue, along with its triggers (if you can). Misunderstandings certainly won’t build support for whatever solution you implement, so lay out the facts in understandable language.</p>
<p>&nbsp;</p>
<p><strong>3 – Say it without blame.</strong> The urge to point fingers may be strong, but now is not the time to indulge it. Even if a vendor completely dropped the ball and botched your project to smithereens, it’s better to deal with the issue professionally—and with the vendor directly—than to air your grievances far and wide. Explain the probable cause of the problem in broad terms (e.g., manufacturing delays, supply chain shortages) but consider keeping the details within your PMO.</p>
<p>&nbsp;</p>
<p><strong>4 – Say it with a solution.</strong> You may not have completely formulated a plan to deal with the problem yet, but framing the issue along with a possible resolution will often go a long way toward maintaining stakeholders’ confidence in your team. Be sure to delineate where the plan is still in development, so you aren’t inadvertently setting expectations you may need to revisit later.</p>
<p><a href="http://www.duration-driven.com/wp-content/uploads/2012/01/SharingBadNews.png"><img class="alignnone size-full wp-image-887" title="SharingBadNews" src="http://www.duration-driven.com/wp-content/uploads/2012/01/SharingBadNews.png" alt="" width="283" height="283" /></a></p>
<p><em><a title="PMAlliance | Project Management Consulting" href="http://www.pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://www.pm-alliance.com/Project_Management_Consulting.htm">project management consulting</a>, <a href="http://www.pm-alliance.com/Project_Management_Training.htm">project management training</a> and <a href="http://www.pm-alliance.com/Project_Office_Development.htm">project office development</a></em> services.</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2012/01/4-tips-for-sharing-bad-news/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Perception vs. Reality: Analysis Paralysis</title>
		<link>http://www.duration-driven.com/2011/12/perception-vs-reality-analysis-paralysis/</link>
		<comments>http://www.duration-driven.com/2011/12/perception-vs-reality-analysis-paralysis/#comments</comments>
		<pubDate>Thu, 22 Dec 2011 12:12:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Management Tips]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=860</guid>
		<description><![CDATA[Sometimes the ability to make a decision eludes us. Most people suffer from it occasionally, but if you seem to have trouble on a regular basis, take a look at the reality of how it can affect you—and your projects—longer term. If you can relate to any of these analysis paralysis scenarios, consider trying some [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2011/12/perception-vs-reality-analysis-paralysis/"></g:plusone></div><p>Sometimes the ability to make a decision eludes us. Most people suffer from it occasionally, but if you seem to have trouble on a regular basis, take a look at the reality of how it can affect you—and your projects—longer term. If you can relate to any of these analysis paralysis scenarios, consider trying some of the tricks we’ve put together (<a href="http://www.duration-driven.com/2010/09/5-tricks-to-overcome-analysis-paralysis/">http://www.duration-driven.com/2010/09/5-tricks-to-overcome-analysis-paralysis/</a>) to help you tackle the problem and get back on track.</p>
<p><span id="more-860"></span></p>
<p>&nbsp;</p>
<p><strong>You’ve developed numerous <em>almost </em>perfect solutions.</strong> You’re still gathering ideas and investigating options, but nothing seems to be a good enough fit.</p>
<p><em>Reality:</em> Rarely does the perfect solution present itself. It’s much more common that PMOs adopt imperfect solutions and then tweak them to better meet the project’s needs.</p>
<p>&nbsp;</p>
<p><strong>You’ve delayed the decision-making date.</strong> Your original date may have slipped significantly.</p>
<p><em>Reality:</em> Follow-on activities may now be delayed, too. Serious challenges could arise if milestones are missed, and it’s likely you’ll have even fewer workable options later if the delay continues.</p>
<p>&nbsp;</p>
<p><strong>You’re preoccupied by the thought of making the wrong decision. </strong>You fear something awful will happen (being chastised by your boss, missing a promotion, maybe even losing your job) if you screw up.</p>
<p><em>Reality:</em> You run a much higher risk of being disciplined if your continued indecision puts your project behind schedule or over budget than if you make a thoughtful, educated decision that turns out to be wrong.</p>
<p>&nbsp;</p>
<p><strong>You’ve avoided involving others in the decision-making process.</strong> The more they push you for a decision—and offer to help you evaluate available options—the more you hoard the final decision for yourself.</p>
<p><em>Reality:</em> Others on your team can often provide useful insight or assist you in weighing the options. Their perspectives on the project are important, and could help point you to the right solution.</p>
<p><a href="http://www.duration-driven.com/wp-content/uploads/2011/12/AnalysisParalysis.jpg"><img class="alignnone size-full wp-image-884" title="AnalysisParalysis" src="http://www.duration-driven.com/wp-content/uploads/2011/12/AnalysisParalysis.jpg" alt="" width="305" height="294" /></a></p>
<p><em><a title="PMAlliance | Project Management Consulting" href="http://www.pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://www.pm-alliance.com/Project_Management_Consulting.htm">project management consulting</a>, <a href="http://www.pm-alliance.com/Project_Management_Training.htm">project management training</a> and <a href="http://www.pm-alliance.com/Project_Office_Development.htm">project office development</a></em> services.</p>
<p>&nbsp;</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2011/12/perception-vs-reality-analysis-paralysis/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>5 Tips to Start the New Year Right</title>
		<link>http://www.duration-driven.com/2011/12/5-tips-to-start-the-new-year-right/</link>
		<comments>http://www.duration-driven.com/2011/12/5-tips-to-start-the-new-year-right/#comments</comments>
		<pubDate>Fri, 16 Dec 2011 16:00:55 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Management Tips]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=855</guid>
		<description><![CDATA[Taking the angst out of year-end can be a challenge http://www.duration-driven.com/2011/11/5-ways-to-make-year-end-less-stressful/, but what about those new-year items that inevitably clog your radar? We’ve put together some tips to help with those, too. 1 – Tie up loose ends. Now is the time to be sure you don’t have any year-end tasks lagging behind. Submit the [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2011/12/5-tips-to-start-the-new-year-right/"></g:plusone></div><p>Taking the angst out of year-end can be a challenge <a href="http://www.duration-driven.com/2011/11/5-ways-to-make-year-end-less-stressful/" target="_blank">http://www.duration-driven.com/2011/11/5-ways-to-make-year-end-less-stressful/</a>, but what about those new-year items that inevitably clog your radar? We’ve put together some tips to help with those, too.</p>
<p><span id="more-855"></span></p>
<p><strong>1 – Tie up loose ends.</strong> Now is the time to be sure you don’t have any year-end tasks lagging behind. Submit the last of your team’s performance evaluation paperwork, process any remaining invoices, and finish setting up files for this year’s approved projects.</p>
<p><strong>2 – Prioritize. </strong>Your new year’s budget may include a lot of good news—approved new hires, authorization for updated software, the go-ahead on key projects, or confirmation of an upcoming expansion—but you still need to be careful with your resources. Determine which initiatives should be tackled first, and delegate those out to the appropriate people. Assign target dates to remaining items so they don’t drop off the radar.</p>
<p><strong>3 – Announce staffing changes.</strong> Information on promotions, transfers, reorganizations, and the loss of any temporary workers in your department should be disseminated throughout your PMO. It makes it easier for staff members to do everything from exercising increased signature authority to redistributing tasks.</p>
<p><strong>4 – Plan early for training opportunities.</strong> Team members with new responsibilities, such as first-time managers, will benefit from getting some education under their belt early in the year. Look for training sessions that outline fundamental principles, so they can feel confident in their abilities and experience less stress going forward.</p>
<p><strong>5 – Bring stakeholders up to speed.</strong> End users and project supporters may be unaware of the final status of proposed initiatives. Instead of fielding hordes of phone calls all asking the same questions, take the time to proactively notify stakeholders about the approval status of projects and when they can expect to learn more about those activities that have received authorization to move forward.</p>
<p><a href="http://www.duration-driven.com/wp-content/uploads/2011/12/Startthenewyearright.jpg"><img class="alignnone size-full wp-image-856" title="Startthenewyearright" src="http://www.duration-driven.com/wp-content/uploads/2011/12/Startthenewyearright.jpg" alt="" width="283" height="280" /></a></p>
<p><em><a title="PMAlliance | Project Management Consulting" href="http://www.pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://www.pm-alliance.com/Project_Management_Consulting.htm">project management consulting</a>, <a href="http://www.pm-alliance.com/Project_Management_Training.htm">project management training</a> and <a href="http://www.pm-alliance.com/Project_Office_Development.htm">project office development</a></em> services.</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2011/12/5-tips-to-start-the-new-year-right/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Value Your Boomers</title>
		<link>http://www.duration-driven.com/2011/12/value-your-boomers/</link>
		<comments>http://www.duration-driven.com/2011/12/value-your-boomers/#comments</comments>
		<pubDate>Mon, 12 Dec 2011 16:30:09 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[PMO Development]]></category>
		<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Management Tips]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=852</guid>
		<description><![CDATA[Millennials may bring innovations and new thinking to your PMO (http://www.duration-driven.com/2011/10/managing-millennials/), but don’t underestimate the value of the Boomer-age professionals on your team. We’ve put together some tips to ensure your entire PMO benefits from the vast knowledge held by your most experienced professionals. Identify your experts. First, determine which team members have the most [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2011/12/value-your-boomers/"></g:plusone></div><p>Millennials may bring innovations and new thinking to your PMO (<a href="http://www.duration-driven.com/2011/10/managing-millennials/" target="_blank">http://www.duration-driven.com/2011/10/managing-millennials/</a>), but don’t underestimate the value of the Boomer-age professionals on your team. We’ve put together some tips to ensure your entire PMO benefits from the vast knowledge held by your most experienced professionals.</p>
<p><span id="more-852"></span></p>
<p><strong>Identify your experts.</strong> First, determine which team members have the most critical—or difficult to attain—experience. Any information that generally takes years to gather and assimilate should be your first priority. Once you know where key pieces of knowledge reside within your PMO, you can put together a strategy to share that expertise with other members.</p>
<p><strong>Be flexible.</strong> If you anticipate losing one or more team members to retirement in the near future, it’s time to determine if your PMO will have a knowledge gap as a result. Unless you’re able to substitute the expertise of another professional or utilize outside resources, you might consider retaining access to Boomers’ experience through consulting agreements or a part-time work arrangement.</p>
<p><strong> </strong></p>
<p><strong>Take advantage of mentoring opportunities.</strong> Don’t let the wealth of knowledge held by your PMO’s Boomers get away. Instead, pair up your less experienced team members with a senior-level professional and encourage them to share information. For best results, consider working with HR to develop a formal, structured mentoring program.</p>
<p><strong>Schedule regular lunch-and-learns.</strong> Once every month or so, pull your team together for an informal knowledge-sharing session. No agendas are needed—instead, pick a topic and let one of your internal experts put together a handful of talking points. Rotate experts frequently, and facilitate as much Q &amp; A time as you can.</p>
<p><strong>Expand your networks.</strong> New PMs are still building their infrastructure of professional connections and may benefit from introductions to key people in your Boomers’ networks. Encourage joint attendance at professional events and networking functions.</p>
<p><a href="http://www.duration-driven.com/wp-content/uploads/2011/12/Valueyourboomers.png"><img class="alignnone size-full wp-image-853" title="Valueyourboomers" src="http://www.duration-driven.com/wp-content/uploads/2011/12/Valueyourboomers.png" alt="" width="280" height="280" /></a></p>
<p><em><a title="PMAlliance | Project Management Consulting" href="http://www.pm-alliance.com/" target="_blank">PM<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://www.pm-alliance.com/Project_Management_Consulting.htm">project management consulting</a>, <a href="http://www.pm-alliance.com/Project_Management_Training.htm">project management training</a> and <a href="http://www.pm-alliance.com/Project_Office_Development.htm">project office development</a></em> services.</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2011/12/value-your-boomers/feed/</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Ready, Set, Delegate!</title>
		<link>http://www.duration-driven.com/2011/12/ready-set-delegate/</link>
		<comments>http://www.duration-driven.com/2011/12/ready-set-delegate/#comments</comments>
		<pubDate>Fri, 02 Dec 2011 16:38:03 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Project Management]]></category>
		<category><![CDATA[Project Management Tips]]></category>

		<guid isPermaLink="false">http://www.duration-driven.com/?p=848</guid>
		<description><![CDATA[We’ve already covered the basics of delegation methodology (http://www.duration-driven.com/2011/03/delegation-101/) and 5 signs you aren’t delegating enough (http://www.duration-driven.com/2011/07/5-signs-you-aren’t-delegating-enough/), but what if you’re still feeling swamped and just need to get on with it? Below is a quick-start guide to help you pick the right tasks to delegate, the right people to take them on, and how [...]]]></description>
			<content:encoded><![CDATA[<div name="googleone_share_1" style="position:relative;z-index:5;float: right; margin-left: 10px;"><g:plusone size="standard" count="" href="http://www.duration-driven.com/2011/12/ready-set-delegate/"></g:plusone></div><p>We’ve already covered the basics of delegation methodology (<a href="http://www.duration-driven.com/2011/03/delegation-101/" target="_blank">http://www.duration-driven.com/2011/03/delegation-101/</a>) and 5 signs you aren’t delegating enough (<a href="http://www.duration-driven.com/2011/07/5-signs-you-aren’t-delegating-enough/" target="_blank">http://www.duration-driven.com/2011/07/5-signs-you-aren’t-delegating-enough/</a>), but what if you’re still feeling swamped and just need to get on with it? Below is a quick-start guide to help you pick the right tasks to delegate, the right people to take them on, and how to ensure your delegation plan works as expected.</p>
<p><span id="more-848"></span></p>
<p><strong>STEP 1: Identify tasks for delegation.</strong> Look at what’s on your plate and determine which items could be done by someone else. Even if it’s just one task, you’ll be doing something positive for your workload and offering another team member the chance to contribute at a higher level. Concerned there isn’t anyone in your PMO qualified to handle any of your tasks? High performers could be good candidates for some quick coaching, and solid performers might benefit from the challenge knowing you’re available for mentoring if they need it.</p>
<p><strong>STEP 2: Prepare the team.</strong> If you haven’t been a good delegator in the past, now might be an opportunity to talk candidly with the team about workload distribution. Let them know the evolution of the PMO is at a point where shifting tasks around makes sense, and consider asking them for suggestions. You may discover they already have ideas about which members’ skill sets mesh well with overflow tasks. This is also your chance to set expectations on both sides of the table.</p>
<p><strong>STEP 3: Delegate! </strong>Once you’ve selected tasks to delegate and the right team members to take them on, it’s time to hand off the responsibility to the new designee and get out of their way. Be available if they have questions or need additional direction, but don’t hover. Follow up regularly to ensure things are happening according to plan and make course corrections as necessary.</p>
<p><a href="http://www.duration-driven.com/wp-content/uploads/2011/12/ReadySetDelegate.png"><img class="alignnone size-full wp-image-849" title="ReadySetDelegate" src="http://www.duration-driven.com/wp-content/uploads/2011/12/ReadySetDelegate.png" alt="" width="263" height="263" /></a></p>
<p><em><a title="PMAlliance | Project Management Consulting" href="http://www.pm-alliance.com/" target="_blank">M<em>Alliance</em></a> uses a team of highly experienced and certified professionals to provide <a href="http://www.pm-alliance.com/Project_Management_Consulting.htm">project management consulting</a>, <a href="http://www.pm-alliance.com/Project_Management_Training.htm">project management training</a> and <a href="http://www.pm-alliance.com/Project_Office_Development.htm">project office development</a></em> services.</p>
<ul class="related_post"><li>No Related Post</li></ul>]]></content:encoded>
			<wfw:commentRss>http://www.duration-driven.com/2011/12/ready-set-delegate/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>